Position: QAQC Engineer
Job Code: Requisition9080
Location: MEA
Maximum Experience: 15
Employment Type: Permanent
▪ Conduct/facilitate training to engineers, supervisors/foreman and chargehand for the relevant activities as per monthly action plan in line with training calendar and schedule.
▪ Prepare the necessary documents for training requirements.
▪ Ensure all inspection & test requirements of the project are met at all stages of process /production as per the PQP/ITP and contract requirements.
▪ Compile all the test records for tests carried out and maintain all records for a retention period contractually agreed.
▪ Preparation of project specific procedures, method statement & inspection test plans and arrange for the issue of the same with the authorization of the Project Manager/QC Manager
▪ Ensure all relevant technical specifications and quality documents are maintained in soft and hard at site.
▪ Monitor the subcontractor’s performance for compliance with quality requirements as per PQP.
▪ Coordinate with site team for proper implementation of quality system requirements.
▪ Assist QA/QC Manager during third party quality audits and follow-up audits (if any).
▪ Responsible for review and close out of non-conformities raised by consultant/client.
▪ Prepare root cause analysis for corrective & preventive actions taken on CARs / NCRs in coordination with the Project Manager/Construction Manager.
▪ Co-ordinate with Site Engineers in closing plan grid issues raised by client.
▪ Co-ordinate with the Project Manager/QA/QC Manager in carrying out the vendor inspections.
▪ Liaise with project personnel on a day to day basis for quality related activities and verify compliance of activities to the approved drawings, Engineer/Engineer’s Representative requirements, QA/QC procedures, inspection test pans and method statements.
▪ Responsible for subcontractor’s method statement/QC plans are implemented at site.
▪ Preparation of weekly/monthly quality report for the review of meetings.
▪ Accountable for the documentation of monitoring and measuring equipment used in site.
▪ Co-ordinate with stores/site engineer for raising and taking approval for material inspection.
▪ Co-ordinate with QC Manager in conducting internal audits.
▪ Co-ordinate with document controller in preparing the final Dossier for the project